Wilbur Smith Associates; Terrence J. DeWan & Associates
The final Eastern Trail Engineering Feasibility Study: Final Report, published in 2001 by Wilbur Smith Associates; Terrence J. DeWan & Associates, is available for download from web site by clicking on the file names below.
These are large PDF files, so may take a while to download depending on the speed on your connection.
The text of the Final Report is in two files:
Part I – pages 1 – 8, includes sections I – Introduction, and II – Existing Conditions
Part II – pages 9 – 17, includes remainder of section II – Existing Condition, plus section on Cost Estimates
Files on specific trail segments:
Trail Segment #4 – Jewett Trail Head to Emerys Bridge Road
Trail Segment #5 – Emerys Bridge Road to S. Berwick/ N.Berwick Town Line
Trail Segment #6 – S. Berwick/N.Berwick Town Line to N. Berwick/Wells Town Line
Trail Segment #7 – N. Berwick/Wells Town Line to Bald Hill Road
Trail Segment #8 – Bald Hill Road to Chicks Crossing Road
Trail Segment #9 – Chicks Crossing Road to Wells/Kennebunk Town Line
Trail Segment #10 – Wells/Kennebunk Town Line to Route 99
Trail Segment #11 – Route 99 to Kennebunk/Arundel Town Line
Trail Segment #12 – Kennebunk/Arundel Town Line to Old Limerick Road
Trail Segment #13 – Old Limerick Road to Arundel/Biddeford Town Line
Trail Segment #14 – Arundel/Biddeford Town Line to Route 111
Trail Segment #15 – Route 111 to Saco River
Trail Segment #16 – Saco River to Route I-195
Trail Segment #17 – Trail Route I-195 to Saco/Old Orchard Beach Town Line
Trail Segment #18 – Saco/Old Orchard Beach Town Line to O.O.B./Scarborough Town Line
Trail Segment #19 – O.O.B./Scarborough Town Line to Black Point Road/Route 207
Trail Segment #20 – Black Point Road/Route 207 to Scarborough/South Portland Town Line
Trail Segment #21 – Scarborough/South Portland Town Line to Ball Fields