Monthly: April 2024

Recruiting new ET Board Members
Latest News

Applications Open for 2024 Board Member Recruitment

The Eastern Trail Alliance is recruiting new board members to join our board this year. If you are looking for a way to make a difference in southern Maine and have a passion for trails or active transportation, we’d like to hear from you!

Click here to access the board member application form. Please then complete it by the May 13, 2024 for full consideration. In particular, skills and experience sought include accounting/audit, fundraising, and previous board service. Given our active trail-building campaigns south of Kennebunk, residents of southern York County are encouraged to apply.

Before after picture of trail repairs
Latest News

Trail Conditions Update

Please be advised that due to recent storms, downed trees and debris can be found along the Eastern Trail.
Our Trail Manager, Patrick Conlon, has spent long days out on the trail clearing downed trees and branches, improving drainage systems, and cleaning up trash.
In Old Orchard Beach, about 300 yards north of the Saco-OOB town line, there was a very large tree completely blocking the trail. Patrick was able to move the tree to the edge of the trail. Nevertheless, please continue to use caution while cycling and walking in this area for the time being.
Thanks to Patrick’s tireless work the trail between Biddeford and Kennebunk is now clear and safe for cyclists and walkers alike. As weather permits, he will continue to attend to the Saco to Scarborough segment.
ET Connectivity Feasibility Study
Latest News

Berwicks to the Border Story Map Released

Led by the planning/engineering firm VHB, the Eastern Trail Alliance and Eastern Trail Management District in collaboration with the Southern Maine Planning and Development Commission (SMPDC), MaineDOT and the municipalities of Kittery, Eliot, York, South Berwick, and North Berwick are proud to release the Eastern Trail Connectivity Feasibility Study Story Map.

This story map will allow you to see information about the initial feasibility study currently underway in the Berwicks to the Border Project, considering locations for future segments of the Eastern Trail between North Berwick and Memorial Bridge in Kittery. The different types of potential route alternatives may include shared-use paths along utility corridors, shared-use paths alongside a public road, boardwalk segments over wetlands and small streams, striped bike lanes or wide shoulders on roadways, and travel lanes shared by all users on rural roads with low traffic volumes and/or speeds. The detailed information is tied to geographic information which gives the public a view of both where and how these preliminary route alternatives may be used.

This 18-month study began in late 2023 and is expected to finish in early 2025. The ultimate goal is to recommend a route for a continuous off-road trail from North Berwick to Kittery. From there, the Eastern Trail Alliance, SMPDC, and individual municipalities will seek additional funding through grants and other sources to implement the priority recommendations from the study.

To learn more, please go here to visit the Story Map.

Additionally, an Eastern Trail Connectivity Study Community Workshop will be held on Tuesday, April 30, 2024 from 6:30 – 8:00 pm at Eliot Town Hall, 1333 State Road, Eliot, ME or via this Zoom link.

https://www.easterntrail.org/