Eastern
Trail
News
Eastern Trail: Scarborough to
South Portland Connector
Final Report
Engineering Feasibility Study - September 2006
The Eastern Trail: Scarborough to South Portland Connector Study seeks
to find a quality connection to fill
an approximate one mile gap in the trail network between the Nonesuch
River in Scarborough and the Wainright Recreation Complex in South
Portland.
All the Engineering Study documents that are available below are in
PDF format, which requires a viewer. This viewer can be
obtained/downloaded for free here.
Table of Contents
Click
here for the complete report (68 pages) with graphics (this is a 5
MB pdf file, so it might take some time to download!)
Click
here for the complete report without graphics (this is only a .8
MB pdf file)
I. Background & Purpose of the Study
II. Study Area
III. Study Process & Summary
IV. Trail Segment, Structure and Alignment Descriptions
V. Cost Estimates
VI. Adopted Trail Alignment & Next Steps
Appendices
Click
here for the complete report appendices (large pdf file) - otherwise,
click on any of the links below:
Appendix
A: Public Meeting Presentations
Appendix
B: Construction Cost Estimates – Trail Surface Cost Estimates by Segment
& Structure Cost Estimates
Appendix
C: Trail Cross-sections
List of Tables
Table 1: Trail Segment Screening / Evaluation
Table 2: Conceptual Trail Alignment Screening / Evaluation
List of Figures
Figure
1: ET Connector Study Area
Figure 2:
Conceptual Trail Segment Options
Figure
3a to 3d: Conceptual Trail Alignments
Figures 4a to 4d:
Recommended Trail Alignment Concept Plans
Figures
4a-1 to 4d-1: Recommended Trail Alignment Photolog
Call us (207.284.9260) or
e-mail the ETA office
|