image of the Eastern Trail web page mastheadEastern Trail Engineering Feasibility Study: Final Report
Wilbur Smith Associates; Terrence J. DeWan & Associates
The final Eastern Trail Engineering Feasibility Study: Final Report, published by Wilbur Smith Associates; Terrence J. DeWan & Associates, is available for download from web site by clicking on the file names below.

These are large PDF files, so may take a while to download depending on the speed on your connection.

The text of the Final Report is in two files:

A detailed Corridor Map of the Proposed Eastern Trail is available here

Files on specific trail segments:

Trail Segment #4 - Jewett Trail Head to Emerys Bridge Road
Trail Segment #5 - Emerys Bridge Road to S. Berwick/ N.Berwick Town Line
Trail Segment #6 - S. Berwick/N.Berwick Town Line to N. Berwick/Wells Town Line
Trail Segment #7 - N. Berwick/Wells Town Line to Bald Hill Road
Trail Segment #8 - Bald Hill Road to Chicks Crossing Road
Trail Segment #9
- Chicks Crossing Road to Wells/Kennebunk Town Line
Trail Segment #10 - Wells/Kennebunk Town Line to Route 99
Trail Segment #11 - Route 99 to Kennebunk/Arundel Town Line
Trail Segment #12 - Kennebunk/Arundel Town Line to Old Limerick Road
Trail Segment #13 - Old Limerick Road to Arundel/Biddeford Town Line
Trail Segment #14 - Arundel/Biddeford Town Line to Route 111
Trail Segment #15 - Route 111 to Saco River
Trail Segment #16 - Saco River to Route I-195
Trail Segment #17 - Route I-195 to Saco/Old Orchard Beach Town Line
Trail Segment #18 - Saco/Old Orchard Beach Town Line to O.O.B./Scarborough Town Line
Trail Segment #19 - O.O.B./Scarborough Town Line to Black Point Road/Route 207
Trail Segment #20 - Black Point Road/Route 207 to Scarborough/South Portland Town Line
Trail Segment #21 - Scarborough/South Portland Town Line to Ball Fields

Return to Eastern Trail library page